Create a Trello-style project management system with Kimi K2.5 | Alpha | PandaiTech

Create a Trello-style project management system with Kimi K2.5

How to code a Kanban board with drag-and-drop functionality and calendar/timeline views using a single prompt.

Learning Timeline
Key Insights

Advantages of Multi-View Switching

By using the right prompt, the AI can build logic where date changes in the 'Timeline' or 'Calendar' view are automatically updated on the Kanban board without needing to write code manually.

AI Output Quality Tips

For more professional results, make sure to ask the AI to include visual elements like colored labels (for example, purple tags) to differentiate between task categories.
Prompts

Basic Kanban Structure Generation

Target: Kimi K2.5
Make a Trello clone. Default view is a Kanban board with multiple columns.

Multi-View & Timeline Generation

Target: Kimi K2.5
Include multi-view switching. Provide a single-click option to toggle the same data between a Kanban board, a Gantt chart timeline and a calendar for deadlines.
Step by Step

Steps to Build a Trello Clone with Kimi K2.5

  1. Access the Kimi K2.5 platform and set up a new code workspace.
  2. Enter an initial prompt to generate a basic Kanban board structure with multiple columns.
  3. Click the Save button to apply the basic configuration.
  4. Enter an additional prompt for the 'multi-view switching' feature to enhance system capabilities.
  5. Instruct the AI to provide a 'single-click toggle' option that allows switching between the Kanban board, Gantt chart timeline, and calendar views.
  6. Ensure the system supports drag-and-drop functionality for every task card.
  7. Verify that the same data is automatically synced across all views (Kanban, timeline, and calendar).

More from AI-Powered Coding & App Development

View All